Project Outline

  • Establish site GPS for all survey and machine control
  • Management, reduction and review of original LiDAR survey point cloud
  • Multiple aerial surveys for updated surface model and imagery (Site included approx. 40km of design tracks with significant elevation change
  • Volume analysis and WTG (Wind Turbine Generator) pad orientation optimisation for improved volume outcomes
  • No safety incidents for the full duration of works in a high-risk environment