Project Outline
- Establish site GPS for all survey and machine control
- Management, reduction and review of original LiDAR survey point cloud
- Multiple aerial surveys for updated surface model and imagery (Site included approx. 40km of design tracks with significant elevation change
- Volume analysis and WTG (Wind Turbine Generator) pad orientation optimisation for improved volume outcomes
- No safety incidents for the full duration of works in a high-risk environment










