Projects

Some Of Our Project Experience

School Surveys - Various

School surveys – Various

Detail survey, scanning, modelling on various schools for fire system analysis and drainage/flood modelling and review, Surveyed to MGA coordinates

Newell-Mitchell Hwy Intersection, Dubbo - SMEC

Newell/Mitchell Hwy Intersection, Dubbo – SMEC

Feature surveys, Utility investigations, planning, Utility design and modelling, Co-existence reviews and presentation, Team meetings, Data/modelling handover, Utility, drainage and road design optimisation

Grafton Bridge – Fulton Hogan

Grafton Bridge – Fulton Hogan

Extensive and detailed utility investigations, Utility relocation modelling, Setout, coordination, works as executed surveys, Detail survey, Earthworks survey – pavements, drainage, Team meetings, Aerial surveys/volumes, Job site visualisation/presentation

Coffs Harbour Bypass (TfNSW)

Coffs Harbour Bypass (TfNSW)

Utility relocation coordination, Water sewer design and relocation coordination, Overhead power surveys and modelling, 3D modelling existing and design utilities

New Dungowan Dam detail surveys (SMEC)

New Dungowan Dam detail surveys (SMEC)

Survey of roads, electrical, new and existing dam sites, Large/remote site with no injuries or incidents, Capture involving laser scanning (terrestrial), aerial LiDAR, Photogrammetry, Static surveys, traditional surveys

White Rock Wind Farm (Fulton Hogan)

White Rock Wind Farm (Fulton Hogan)

Establish site GPS for all survey and machine control, Management, reduction and review of original LiDAR survey point cloud, Multiple aerial surveys for updated surface model and imagery

Kyogle, Glen Innes, Inverell, Armidale, Tenterfield, Clarence

Kyogle, Glen Innes, Inverell, Armidale, Tenterfield, Clarence

Bridge, road surveys and GPS setup/supply, Survey of multiple bridges and roads using multiple capture techniques, Short notification period and fast response to site

Coffs Harbour City Council Waste Management Facility

Coffs Harbour City Council Waste Management Facility

Aerial capture of full landfill site – LiDAR and Photogrammetry, Out of hours capture due to proximity to airport and CASA regulations, GPS establishment for survey control and quality check surveys, Postproduction, data reduction and quality checks

Get in touch with GPS Onsite

Start your next Engineering Survey project with us.